King Contractor School
    Pick the right category before you start

    Florida General Contractor work areas: Single Family, Multi Family, Commercial — which one is yours?

    Picking the wrong license category costs months of wasted process. This page explains the scope of CRC, CBC and CGC and which Florida market each one fits.

    This course is currently taught in Portuguese. English and Spanish versions are in development; no launch date has been announced.

    CRC · ResidentialCBC · BuildingCGC · GeneralFlorida Statute 489

    Why picking the right category is the first critical decision

    DBPR offers three Certified Contractor categories for vertical construction in Florida: CRC, CBC and CGC. Each has a distinct legal scope, its own Trade exam and a different market demand. Picking the wrong one means you're either under-licensed for the work you want, or you paid and studied more than necessary.

    CRC, Certified Residential Contractor

    Legal scope (FS 489.105(3)(d)): authorized to build, repair and modify one-family and two-family residences and accessory structures (garages, sheds, residential pools).

    • Single-family homes (custom, spec, tract)
    • Duplex (up to 2 units in one structure)
    • Luxury homes, gated communities
    • Residential remodels and additions
    • Pool houses, ADUs (Accessory Dwelling Units)

    Does not authorize: townhomes beyond duplex, apartments, vertical condominiums, commercial, hotels. Those require CBC or CGC.

    When it fits: if you intend to focus on custom residential in Orlando, Kissimmee, Davenport, Jacksonville, Tampa suburbs. Hot market, $350k–$800k average ticket.

    CBC, Certified Building Contractor

    Legal scope (FS 489.105(3)(b)): authorized to build commercial buildings up to 3 stories and multi-family residential of any size, provided they are no taller than 3 stories.

    • Townhomes, fourplexes, garden-style apartments
    • Low-rise mixed-use (retail below, residential above)
    • Strip malls, retail plazas
    • Restaurants, retail stores
    • Small hotels and boutique hotels (up to 3 stories)
    • Small schools, churches, small offices
    • Single-family and duplex (CBC includes everything CRC covers)

    Does not authorize: buildings above 3 stories (mid-rise/high-rise), large hospital complexes, heavy industrial. Those require CGC.

    When it fits: for most candidates wanting flexibility, it covers residential and small commercial, opening two markets at once. Most popular King Training choice.

    CGC, Certified General Contractor

    Legal scope (FS 489.105(3)(a)): authorized to build any type of structure, with no limit on height, area or occupancy. The broadest category.

    • Everything CRC and CBC cover
    • Mid-rise and high-rise (vertical condos, large hotels)
    • Hospitals, large schools, universities
    • Stadiums, arenas, convention centers
    • Large shopping centers
    • Industrial buildings and factories
    • Public works (DOT, county, federal)

    When it fits: if you want to work on large projects, tall buildings, or plan to compete for public and high-value commercial contracts. Trade exam is denser, but the license opens every door.

    Direct comparison: CRC vs CBC vs CGC

    FeatureCRCCBCCGC
    Single-family✅✅✅
    Duplex✅✅✅
    Townhomes / multi-family❌✅ (up to 3 stories)✅ (any)
    Commercial up to 3 stories❌✅✅
    Mid-rise / high-rise❌❌✅
    Hospitals / large schools❌❌✅
    Large public workslimitedlimited✅

    Hot Florida markets by category

    Single-Family (CRC or CBC)

    Orlando, Kissimmee, Davenport, Tampa, Jacksonville, Cape Coral, Port St. Lucie. Residential boom driven by domestic in-migration and second-home buyers. Custom homes, spec homes, urban infill.

    Multi-Family / Townhomes (CBC)

    Doral, Pompano Beach, Deerfield Beach, Boca Raton, Lake Nona, Winter Garden. High rental demand, investment funds building build-to-rent communities. Lower % margins, much larger absolute dollars.

    Small Commercial & Build-Out (CBC)

    Strip malls across South Florida, restaurant build-outs, clinics, salons, gyms. Short cycles (3–6 months), 15–20% margins, very active market.

    Mid-Rise / High-Rise (CGC)

    Brickell, Downtown Miami, Sunny Isles, Hollywood, Aventura, Downtown Orlando, Tampa Riverwalk. Luxury vertical condos, hotels. $30M–$500M tickets. Typically joint ventures and established GCs.

    How to pick your category

    1. If you only want to build homes: CRC is enough and the lighter exam.
    2. If you want flexibility (residential + small commercial): CBC. Most popular pick.
    3. If you think big (mid-rise, heavy commercial, public works): CGC. Denser exam, higher ceiling.

    Important: upgrading between categories is allowed later (CRC → CBC → CGC), but requires retaking the new category exam. That's why many candidates go straight to CBC or CGC, avoiding repeating the process later.

    Next step: define your category

    King Training is structured for CRC, CBC and CGC. Lesson one helps you pick the right category before filing the DBPR application, avoiding the most expensive mistake of the whole journey. See how a GC's day to day works and how much each category bills.

    Ready for the legal shortcut?

    Stop chasing diploma equivalence. Start with the license that pays today.

    King Training is a course taught in Portuguese that takes you from the DBPR application to passing the Pearson VUE exam for the Florida General Contractor license.

    See the price
    Frequently asked questions

    Direct answers, no fluff

    What is the difference between CRC, CBC and CGC licenses in Florida?

    CRC (Certified Residential Contractor) covers only single-family and duplex. CBC (Certified Building Contractor) covers commercial up to 3 stories and multi-family of any size. CGC (Certified General Contractor) covers any height, any area, any occupancy — the broadest license.

    Can I build a hospital or hotel with a CRC license?

    No. CRC authorizes only single-family and duplex. Hospitals, hotels, schools and tall buildings require CGC. Commercial buildings up to 3 stories and multi-family require at least CBC.

    Which license is easiest to obtain: CRC, CBC or CGC?

    All have the same exam structure (Business & Finance, Contract Administration and Project Management), but the Trade content varies in complexity. CRC focuses on residential; CGC covers tall structures and denser commercial codes. Most ambitious candidates go straight to CBC or CGC for breadth.

    How many stories of multi-family can I build with CBC?

    CBC authorizes multi-family of any size as long as the structure is up to 3 stories above grade level. For taller buildings (mid-rise and high-rise), CGC is required.

    The DBPR license is the credential that pays in U.S. dollars.

    Start today the path many professionals have already walked to build, bill and scale legally in Florida.

    Enroll in King Training